The plumbers are back to deal with the fallout from the leak in the main bathroom. It would appear that the leak has probably been going on for years – there was a veritable swimming pool of water sitting underneath the floorboards, and I’ve had to have a dehumidifier working 24/7 for several weeks to dry it out.

I’m going to need new joists, new floorboards, a new bath, replacement pipework to upgrade the leaky galvanised steel pipes, and a replastered ceiling. That’s before they then do the more cosmetic stuff of re-tiling and putting down new flooring. They’ve made a start today, but it’s going to take all next week to finish it.

Today’s problem is how to remove and replace the old steel pipework. That involves working in a very confined space in the loft, and they can’t use an angle grinder as that would set light to the Victorian sawdust loft insulation! So they are having to use a hacksaw and there is much wailing and gnashing of teeth. It does not appear to be going well……

{ 1 } Comments

  1. pauld | 3 September 2019 at 3:30 pm | Permalink

    hope its fixed price contract